New sortation solution at Clipper Logistics

Logistex has designed and installed a sortation solution for Clipper’s latest facility located at the M1 Junction 15 near Northampton. The sorter was designed, manufactured, installed, commissioned and operational within 6 months of contract signature – that’s about half the time normally associated with this type of system!

Clipper’s Head of Solutions said:  “I am sure we will work together on future projects based on the experience we have had on this project. The support and, perhaps more importantly, the communication has been excellent. The integrity and honesty of the team at Logistex has impressed me a great deal.”  Read more here.

 

 

Leave a Reply

Your email address will not be published.